Contact Us: Please contact us with any questions or concerns about CV Link construction
Project Hotline: (833) 4CV-LINK (428-5465)
Email: info@coachellavalleylink.com
Latest Construction Updates:
North Palm Springs
Highway 111 to Vista Chino
Work to be completed: Painting of shade structures, crack repairs, crosswalk signal improvements at Gene Autry and Vista Chino
Central Palm Springs
Ramon Road Undercrossing
Work to be completed: Grading pathway, install of rebar and placement of cement
E. Mesquite Ave at S. Farrell Drive
Work to be completed: Install 3′ Extension for Bicycle Signal
South Palm Springs & Cathedral City
Ave 34th
Work to be completed: Pedestrian push button repair, striping repair
Cathedral Canyon Dr
Work to be completed: Pedestrian crosswalk and signal
Date Palm Undercrossing
Work to be completed: Painting of name on bridge
La Quinta to Coachella
Jefferson
Work to be completed: Installation of cable railing
Miles Undercrossing
Work to be completed: Installation of striping and puck lights with projected completion of 11/21. Pathway is open during construction.
Golf Club to Dillon Road
Work to be completed: Installation of traffic signal pole lights.
Dillon Road to Ave 50
Work to be completed: Installation of column lights and flashing stop signs.
Indio Blvd
Work to be completed: Installation of highwater detection system, striping, solar path lights, painting of undercrossing, and installation of canopy structure
Project wide
Work to be completed: Crack repair, sign installation, and safety enhancements